About the wind farm
Place: Blåbergsliden, Burträsk, Skellefteå Municipality
Project area: 1,200 hectares
Wind turbines: 26 General Electric GE-158 Cypress (5.5 MW)
Total height: 199.5 metres
Maximum power: 143 MW
Approximate annual production: 400 GWh
Holmen's shareholding: 100 per cent
Commissioning: 2021
Grid connection: 150kV Skellefteå Kraft Elnät AB